Notice the alignment of the windows & the main door? All I can say the whole hse is slanted, this makes all the reno even harder for measurements.
DC i
12.12.08: A week has passed, this kitchen top is still at this brick state!
Looking at this pix makes my blood boils cum heart bleed. Already told the worker I dun really need the tiles to be even with the utility room. If need to be even the cement layed definately will be more than 5cm which HDB dun permit. And this keh kiang worker went to lay them even and the more kiang thing he did is in order not to exceed 5cm full of cement, he went ahead to buy materials to fill up the height! The materials are a big piece of foam block & metal gauze and only need half of it (the material only comes in one size) which cost me 250 bucks!
14.12.08: Plastering for the whole hse, no more 'mo peng'.17.12.08: New dustin chute. The pink surface is juz the protection sticker.
20.12.08: Most major reno done. View from the main door.
Main door
MBR doorThe only place which i'm impress with is the toilet. Piping not painted yet.